Skip to content
Die-Cast Kitchen Gadgets Manufacturer · Jiangmen, China · ISO 9001 · BSCI · SGS Audited huge930608@gmail.com · WhatsApp +86 137 2340 4027
LeeYuen logo lee yuenKitchenware Manufacturer

One Factory Floor: Casting to Carton

Vertical integration is not a buzzword here — it is why problems trace to a lot within hours and why 300,000+ pieces leave our floor every month.

1 · Melting & dosing at LeeYuen factory

1 · Melting & dosing

Food-grade aluminum ingot held at 640–700 °C; each shot dosed to gram precision — over-dosing makes flash, under-dosing makes cold shuts.

2 · Die casting at LeeYuen factory

2 · Die casting

One-piece castings on our own presses: bowl, neck and handle formed in a single 40–60 second cycle. No welds, no seam failures.

3 · Trimming & deburring at LeeYuen factory

3 · Trimming & deburring

Gates and overflows trimmed while warm; edges deburred and inspected 100% visually at the trim station.

4 · Polishing & finishing at LeeYuen factory

4 · Polishing & finishing

Tumble and hand polishing to satin or mirror; plated and PVD finishes for zinc components.

5 · Coating at LeeYuen factory

5 · Coating

Pantone-matched powder and liquid coatings, baked and adhesion-tested. FDA/LFGB per formulation.

6 · QC & packing at LeeYuen factory

6 · QC & packing

AQL 2.5 final inspection, coating cross-hatch tests, handle torque checks — then retail or export packing.

Capacity & equipment

Factory area3,400 m² total facility · 2,885 m² covered plant area per SGS report QIP-ASI251804
Die-casting pressesAluminum & zinc alloy presses, 88–268 t, in-house
Monthly output300,000+ pieces · 200,000+ pieces exported monthly
WarehousingTurnover 40% faster than conventional; order dispatch within 7 days for stocked programs
Urgent ordersPriority scheduling line for urgent commercial programs
QC standardISO 9001:2015 · incoming certs · in-process checks · AQL 2.5 final

What this means for buyers

  • Cast-in-house = full control over porosity and finish quality
  • Stocked fast-movers dispatch within 7 days
  • New tooling 25–30 days, T1 samples 7–10 days after
  • Factory tours and live video audits welcome